Booster 3 Overview:

SpaceX has built its first booster prototype to be used for testing. Booster 3 will aim to cryogenically test its tanks and perform a static fire. Live updates can be found below.

Booster 3 MilestonesCurrent No Earlier Than (NET) dates
Ambient Pressure Test (completed)July 08, 2021
Cryo Proof (completed)July 13, 2021 -~21:45 UTC – July 13, 2021 -~23:30 UTC
July 13, 2021 -~16:45 CDT – July 13, 2021 -~18:30 CDT
Static Fire #1 (completed)July 20, 2021 – 00:05:23 UTC
July 19, 2021 -19:05:23 CDT

Live Updates:

August 15, 2021 ~ 01:54 UTC [August 14, 2021 ~ 20:54 CDT]

Booster 3’s top section, the methane tank, has been lowered to ground level.

August 15, 2021 ~ 01:30 UTC [August 14, 2021 ~ 20:30 CDT]

The methane rank section of Booster 3 is in the air!

August 14, 2021 ~ 20:45 UTC [15:45 CDT]

Crews have just descended from the joint between the methane and liquid oxygen tanks. It appears that it may have been cut.

August 14, 2021 ~ 16:10 UTC [11:10 CDT]

The load spreader has been attached to Booster 3 in preparation for a lift.

July 22, 2021 ~ 19:30 UTC [14:30 CDT]

At this time, all three Raptors have been removed from Booster 3.

July 22, 2021 ~ 19:45 UTC [14:45 CDT]

A single Raptor engine is being removed from Booster 3. The engine was RC59.

[Static Fire] July 20, 2021 ~ 01:59 UTC [July 19, 2021 ~20:59 CDT]

The beach and road are now open.

[Static Fire] July 20, 2021 – 00:05:23 UTC [July 19, 2021 – 19:05:23 CDT]

Detanking has started.

[Static Fire] July 20, 2021 ~ 00:05 UTC [July 19, 2021 ~19:05 CDT]

Static Fire!

[Static Fire] July 19, 2021 ~ 23:49 UTC [18:48 CDT]

Siren

[Static Fire] uly 19, 2021 – 23:37:53 UTC [18:37:52 CDT]

Propellant load has begun.

[Static Fire] July 19, 2021 ~ 23:29 UTC [18:29 CDT]

Clouds can be seen from the tank farm.

[Static Fire] July 19, 2021 – 23:19:30 UTC [18:19:30 CDT]

Methane recondenser is on.

[Static Fire] July 19, 2021 ~ 21:45 UTC [16:45 CDT]

Road has been closed and pad has been cleared.

[Static Fire] July 19, 2021 – 21:22 UTC [16:22 CDT]

Boca Chica Beach is now closed.

July 18, 2021 – 18:27 UTC [13:27 CDT]

Residents have received an alert notice for a potential static fire tomorrow, July 19.

July 15, 2021 – 09:20 UTC [14:20 CDT]

There is no static fire today. The road closures have been cancelled for the event.

July 15, 2021 ~ 02:58 UTC [July 14, 2021 ~21:58 CDT]

Residents have received an alert notice for a potential static fire tomorrow, July 15.

July 14, 2021 – 17:10 UTC [12:10 CDT]

There is no static fire today. The road closures have been cancelled for the event.

July 14, 2021 – 14:51 UTC [09:51 CDT]

Residents have received an alert notice for a potential static fire today.

[Cryo Proof] July 12, 2021 – 23:36 UTC [18:36 CDT]

Both the road and pad have been reopened.

[Cryo Proof] July 12, 2021 – 23:32 UTC [18:32 CDT]

Depressurization has started.

[Cryo Proof] July 12, 2021 – 23:13 UTC [18:13 CDT]

Frost has started to reappear on the vehicle.

[Cryo Proof] July 12, 2021 – 22:59 UTC [17:59 CDT]

Frost has begun to decrease.

[Cryo Proof] July 12, 2021 – 22:38 UTC [17:38 CDT]

Frost has formed on the vehicle.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Discover more from Everyday Astronaut

Subscribe now to keep reading and get access to the full archive.

Continue reading